Yard crane scheduling in the presence of uncertain handling times

Hamid Ghaani Farashahi, Yong Wu, Peter Tatham

Research output: Chapter in Book/Report/Conference proceedingConference contributionScientificpeer-review

Original languageEnglish
Title of host publicationThe 6th International Conference on Engineering, Project, and Production Management: Conference Proceedings
EditorsJoanna Ejdys, David Chua, John Smallwood
Place of PublicationGold Coast
PublisherGriffith University
Publication date2015
ISBN (Print)978-1-922216-76-2
Publication statusPublished - 2015
MoE publication typeA4 Article in conference proceedings
EventInternational Conference on Engineering, Project, & Production Management (EPPM) - Gold Coast , Australia
Duration: 02.09.201504.09.2015
Conference number: 6

Keywords

  • 512 Business and Management

Cite this

Farashahi, H. G., Wu, Y., & Tatham, P. (2015). Yard crane scheduling in the presence of uncertain handling times. In J. Ejdys, D. Chua, & J. Smallwood (Eds.), The 6th International Conference on Engineering, Project, and Production Management: Conference Proceedings Griffith University. http://www.ppml.url.tw/EPPM/conferences/2015/download/Yard%20Crane%20Scheduling%20in%20the%20Presence%20of%20Uncertain%20Handling%20Times.pdf